Weekly Design Tip

If you are addressing some SPRING TIME UPDATES…..Be sure to give your bathroom tile your attention way before the contractor needs it. It does have to be ordered at times or shipped to the desirable location for pick up, which could take several days or weeks in some cases. AND as you can see, there’s a lot to “think through” and specify with this aspect of your remodeling project and you don’t need these decisions to be impulsive – function and design are impactful. Your tile contractor needs to be available to work through the design process with your designer to measure and order properly.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: